Consultancy Agreement Cedd

. Agreement No. CE 14/2017 (HY) Provide universal accessibility infrastructure on pedestrian walkways, elevated sidewalks and subways Package 3 – Study, Design and Construction . Accord No. CE 51/2013 (HY) Expansion of the west and east section of Lin Ma Hang Road – Design and Construction . Accord no CE 44/2016 (HY) Condition Survey and Principal Inspection of Tate`s Cairn Tunnel – Investigation Agreement No. CE 52/2018 (HY) Making universal accessibility infrastructure available on pedestrian walkways, Elevated sidewalks and subways Package 5 – Study, design and construction agreement No. 53/2018 (HY) The provision of universal accessibility infrastructure on pedestrian walkways, sidewalks and subways package 6 – Study, design and construction convention No. CE 54/2018 (HY) Universal Accessibility Facilities on Walkways, Elevated Sidewalks and Subways Package 7 – Study, Design and Construction Agreement No CE 23/2013 (HY) Principal Inspection of Cross-Harbour Tunnel and Associated Studies – Investigation . Agreement No.

26/2017 (HY) Proposed work for environmental improvement at Kwun Tong – Ngau Tau Kok Portion Investigation Agreement No. CE 18/2018 (HY) Noise-cancelling wall upgrade on Po Lam Road North and Po Ning Road – Study, Design and Construction. Agreement No. CE 48/2018 (HY) Lion Rock Tunnel Improvement – Investigation Agreement CE 65/2016 (HY) Other study on the West Bypass of Tuen Mun – Investigation Agreement NO. 76/CE 2017 (HY) Modernization of the remaining sections of Kam Tin Road and Lam Kam Road – Investigation Agreement CE 17/2013 (HY) Castle Peak Road Expansion – Castle Peak Bay – Design and Construction Contract No. CE 41/2017 (HY) Proposal of pedestrian bridge system at Mong Kok – Design and Bauvereinbarung No. CE 18/2011 (GE) Preventive Maintenance Programme (2013 – 2018) of Roadside Man-made/Slopes/Retaining Walls in New Territories – Investigation, Design and Construction Agreement No. CE 10/2017 (HY) Lift and Pedestrian Walkway System between Castle Peak Road and Kung Yip Street, Kwai Chung – Design and Construction Retrofitting of Noise Barriers on Tuen Mun Road (Town Centre and Fu Tei Sections) – Design and Construction Agreement No. CE 1/2018 (EC) Strategic Railway Study 2030 – Feasibility Study . Agreement No.

CE 94/2017 (HY) Verification of the feasibility of the pedestrian metro system at Causeway Bay – Feasibility Study Agreement NO. CE 28/2017 (HY) Pedestrian Link near Chuk Yuen North Estate – Design and Construction . Agreement No. CE 53/2016 (HY) Shatin to Central Link (SCL) Professional Services in conjunction with the SCL Operations Concession Service – Investigation Agreement CE 55/2017 (HY) Feasibility assessment for the implementation of accessibility devices on Separate Sidewalks – Feasibility Study Agreement NO. CE 70/2017 (HY) Review of Potential Roadside Road Safety Threats at the Hong Kong Road Network – Investigation Agreement 14/2013 New Wang Tong River Bridge Environmental Impact and Assessment Drainage Study No. CE 51/2016 (HY) Route 11 (between North Lantau and Yuen Long) – Feasibility study .